East 1st Street Reconstruction
East 1st Street from Beach St to East of West Fork of the Trinity River. City of Fort Worth-TxDOT This was a joint TxDOT-City of
East 1st Street from Beach St to East of West Fork of the Trinity River. City of Fort Worth-TxDOT This was a joint TxDOT-City of
Murphy Road Reconstruction City of Sachse MVE was the prime consultant responsible for the design of this one-mile reconstruction in Sachse, TX. The project included widening
Campbell Street Reconstruction Crenshaw Avenue to Avenue KFort Worth, Texas The project included 3,100 LF of residential collector street with curb and gutter, replacement of
Silver Creek Road ImprovementsBrewer HS to City LimitFort Worth, Texas Silver Creek Road is an arterial serving Brewer High School and a rather large developing
East 1st Street Bridge over West Fork of the Trinity River. City of Fort Worth-TxDOT This was a joint TxDOT-City of Fort Worth project. Included
City of Fort Worth West Lancaster Bridge Rehabilitation – Project Engineer. Provided field inspection and design engineering services to rehabilitate fatigue cracking at and near
Silver Creek Road ImprovementsBrewer HS to City LimitFort Worth, Texas Silver Creek Road is an arterial serving Brewer High School and a rather large developing
SH 183 Managed LanesLoop 12-IH 35 Managed Lanes WishboneDallas, TX The CDA project includes improvements to 27.8 miles of highways. The project includes SH 183
Campbell Street Reconstruction Crenshaw Avenue to Avenue KFort Worth, Texas The project included 3,100 LF of residential collector street with curb and gutter, replacement of
Plano Transit Village VelowebCity of Plano This project consisted of approximately one mile of pedestrian/bike trail beginning at the Westbound Frontage Road of PGBT continuing
Cypress Waters TrailBicycle/Pedestrian Facility ImprovementsDallas County 1.5 miles of 14-foot-wide bicycle and pedestrian trail adjacent to North Lake and 10’ sidewalk along Olympus Blvd, as
Cotton Belt TrailCity of Waco The project consisted of converting an abandoned Cotton Belt Railroad right-of-way into a hike/bike trail. The 2.5 mile long
Bridge Street Bicycle and Pedestrian Facility Improvements Fort Worth, Texas This project consisted of 2 miles of trail development along Bridge Street from Oakland Blvd
Bridge Street Bicycle and Pedestrian Facility Improvements Fort Worth, Texas This project consisted of 2 miles of trail development along Bridge Street from Oakland Blvd
Murphy Road Reconstruction City of Sachse MVE was the prime consultant responsible for the design of this one-mile reconstruction in Sachse, TX. The project included widening
Our experience includes feasibility and alternatives analysis and design and production of construction plans. Our professionals have…
Core staff have been together in three decades… and have built a professional design practice that rivals…
Texas cities and counties are growing at a record pace. We work with our municipal clients to support…
MVE has experience in the analysis and design of drainage projects for new construction and rehabilitation projects. This includes…
In addition to construction engineering, we have a strong staff of construction inspectors ready to serve…
MVE has experience in developing traffic control plans on major project involving…