East 1st Street Bridge over West Fork of the Trinity River. City of Fort Worth-TxDOT
This was a joint TxDOT-City of Fort Worth project. Included the construction of a new bridge over the Trinity River, and two new relief bridges at the west and east relief channels and also realignment/widening of 8200 Feet of East 1st Street from Beach Street to the bridge over the Trinity River in the City of Fort Worth, Texas.
Mr. Lindsey was the project manager and the lead Design Engineer responsible for the design of the roadway and performed the bridge type study, the preliminary bridge layouts, the quantities and cost estimates for the various design alternatives.