Plano Transit Village Veloweb

Plano Transit Village VelowebCity of Plano This project consisted of approximately one mile of pedestrian/bike trail beginning at the Westbound Frontage Road of PGBT continuing north in the DART R.O.W. to 12th St and then winding through to the cul-de-sac of 12th Place. The project included all alignment design for the trail, associated drainage design, […]
SH 183 Managed Lanes CDA

SH 183 Managed LanesLoop 12-IH 35 Managed Lanes WishboneDallas, TX The CDA project includes improvements to 27.8 miles of highways. The project includes SH 183 from SH 121 to IH-35E, SH 114 from SH 183 to International Pkwy and Loop 12 from SH 183 to IH-35E. The project will improve existing lanes of the highways; […]
W Lancaster Ave at Clear Fork of Trinity River Rehabilitation

City of Fort Worth West Lancaster Bridge Rehabilitation – Project Engineer. Provided field inspection and design engineering services to rehabilitate fatigue cracking at and near the bridge bearings on West Lancaster Avenue crossing the Clear Fork of the Trinity River. The deck-truss bridge is 2,975 feet long with a 40-foot-wide deck. It was constructed in […]
East 1st Street Bridge Replacement & Rehab

East 1st Street Bridge over West Fork of the Trinity River. City of Fort Worth-TxDOT This was a joint TxDOT-City of Fort Worth project. Included the construction of a new bridge over the Trinity River, and two new relief bridges at the west and east relief channels and also realignment/widening of 8200 Feet of East […]